Meat processing factory ARIANT (sausage production) in Tscheljabinsk, Russia
roughly 12,600 m² gross floor area
production capacity 107.5 to/Tag
Client
OAO CHEMK
Field
Food industry
Task
Planning and consulting for Western basic engineering; concept and detailed planning for media supply and interior construction
The building for sausage production had already been under construction; a concept for media supply using the available space in the existing construction was elaborated; the pipe concept for media supply was coordinated until 3D-planning. Detailed building planning for relevant key details, tender documentation for interior construction.
Period of time
2012 - 2013