heat pump machine room
heat pump machine room
refrigerant transfer station
Test stand construction at the manufacturer's premises
General planning services for the heat pump system at the Spittelau waste incineration plant (MVA)
2 heat pumps with each 8.4 MW
heating capacity 90°C outlet temperature heat sink
heat source: flue condensation from the MVA
Client
Wien Energie GmbH
Field
Energy supplier
Task
Basic & Detail Engineering, accompanying engineering, system integration
Period of time
2020 - ongoing