large-scale heat pump mVA Spittelau

General planning services for the heat pump system at the Spittelau waste incineration plant (MVA)

PlanNing

2 heat pumps with each  8.4 MW 
heating capacity 90°C outlet temperature heat sink
heat source: flue condensation from the MVA     
 

Client
Wien Energie GmbH

Field
Energy supplier

Task
Basic & Detail Engineering, accompanying engineering, system integration

Period of time
2020 - ongoing